Commercial Solar In Georgetown: Proven 69.44 kW project
Ecofibre: 69.44 kW Roof and Facade Solar in Georgetown, Kentucky
This commercial solar project in Georgetown gave Ecofibre’s U.S. headquarters a 69.44 kW solar system spanning both the roof and the side of the building. Solar Energy Solutions (SES) designed and installed the system in 2020 as part of a facility planned from the ground up around sustainability.
About Ecofibre
Ecofibre is an Australia-based company that develops hemp-based products, including textiles and composite materials. When it chose a home for its U.S. headquarters, Georgetown, Kentucky was a natural fit. The area has been part of Kentucky’s hemp story since the 1700s, and the state embraced hemp production and processing after the 2018 Farm Bill made it legal nationwide.
The roughly 50,000-square-foot facility combines offices, manufacturing space, and a warehouse and fulfillment center. Ecofibre made energy efficiency a priority from the first design conversations in 2019, and investing in commercial solar in Georgetown was part of that plan from the start. The building was completed in about 11 months, even in the middle of the pandemic.
Solar Built Into a LEED Platinum Design
In 2020, the facility earned LEED (Leadership in Energy and Environmental Design) Platinum certification, the highest level awarded by the U.S. Green Building Council. It became the first hemp processing facility in the nation to reach that level, and the first LEED v4 Platinum warehouse and distribution facility in the United States.
Solar was one piece of a broader strategy that also included a geothermal system, rainwater capture, and nearly 70 tubular skylights that bring daylight into offices and clean rooms. Alongside those efficiency measures, the solar array helps offset the energy needed for hemp-specific operations like clean rooms.
The System: Two Arrays, One Inverter
SES designed the 69.44 kW system as two arrays that work together. On the roof, 88 Trina Solar 380-watt panels are mounted at a 10-degree tilt, a low angle that suits the flat roof. On the building’s southwest-facing wall, 96 Canadian Solar 375-watt panels are mounted vertically, turning the exterior into a second energy-producing surface.
All 184 panels feed a single SMA Sunny Tripower CORE1 62-US-41 inverter, which converts the power from both arrays for use in the building.
Why This Commercial Solar in Georgetown Project Works
Vertical panels produce less energy per kilowatt than tilted roof panels, and the design accounts for that. The roof array is modeled to generate about 39,900 kWh in its first year, while the facade adds about 28,400 kWh. Adding the facade more than doubled the system’s capacity without using any more roof space.
The facade array also makes the building’s commitment to clean energy visible to everyone who passes by. That combination of added production and visibility is what makes this commercial solar in Georgetown stand out. For a company whose products come from a renewable crop, solar is a fitting way to power the place where that work happens.
Projected Production and Environmental Impact
Together, the two arrays are projected to produce about 68,300 kWh in their first year. Based on each module manufacturer’s 25-year power warranty, the system is projected to generate nearly 1.6 million kWh over its warranted life.
Using the EPA Greenhouse Gas Equivalencies Calculator and the regional avoided-emissions rate for central Kentucky, that clean energy will offset roughly 1,260 metric tons (about 2.8 million pounds) of carbon dioxide. That is the equivalent of taking more than 3.2 million miles of driving off the road, or avoiding the burning of about 1.4 million pounds of coal.
Lessons for Other Commercial Buildings
The Ecofibre project shows how much flexibility a well-planned system can offer. Many commercial buildings have rooftops crowded with HVAC units, vents, and skylights, which limits how many panels fit. A wall with good sun exposure can add meaningful capacity without competing for that space.
Timing matters too. Because Ecofibre planned for solar during design rather than adding it later, the arrays, wiring, and inverter location could be coordinated with the rest of the building. For businesses planning new construction or a major renovation, bringing a solar installer in early can open up options like this one. It can also support green building goals such as LEED certification.
For property owners weighing commercial solar in Georgetown and the surrounding region, the takeaway is simple: the best system starts with the building itself, not a one-size-fits-all layout.
Why Businesses Choose SES
SES handles commercial solar from start to finish with its own team, from design and engineering to installation and long-term service. Every system is designed around the building, the site, and the way the business uses energy, just as the Ecofibre roof and facade arrays were.
Whether you’re considering commercial solar in Georgetown or anywhere across our service area, SES can help you understand what a system could produce for your facility. Explore more of our commercial solar projects or contact SES today for a free quote.
Project At A Glance
- Location: Georgetown, Kentucky
- Completed: 2020
- Size: 69.44 kW
- Year 1 Output: 68,320 kWh
- 25-Year Output: 1,581,866 kWh
- CO2 Avoided: 1,263 metric tons (about 2.79 million lbs)
- Equivalent Miles Driven: about 3.21 million miles
- Equivalent Coal Burned: about 1.40 million lbs (about 702 short tons)